Summer orchard access: a contractor briefing checklist

What to tell contractors before they arrive, how to communicate changes during the day, and a briefing template you can adapt for your orchard.

Last reviewed 22 October 2026. General information, not legal advice: for your own situation, check the official sources linked in each section.

Before contractors arrive at your orchard, confirm where they should enter, where they will work, which areas are restricted and who to contact. Agree how you will tell them about changes while they are on site, as well as how they will report their arrival and departure.

HortNZ's October 2026 El Niño preparation advice is a useful prompt to review that briefing. It emphasises local conditions and preparation for a range of outcomes. A seasonal outlook is not a forecast for your individual block. Check current forecasts and official local advice as the work approaches.

This guide focuses on the access and communication part of summer preparation. Use it alongside your orchard's risk assessments, work procedures and emergency plan.

A summer access checklist

Use these questions to review the briefing for the actual job and site:

  1. Entrance and route. Which gate should the contractor use? Where should they park or report, and which tracks should they avoid?
  2. Work area and restrictions. Which block is the job in? What other work, spray restrictions or access changes do they need to know about?
  3. Today's conditions. What has changed since their last visit? Who decides whether the work or route needs to change?
  4. Contact and updates. Who is the orchard contact, and how will both sides report a change or a problem?
  5. Emergency arrangements. How will people raise the alarm, where will they assemble, and how will you account for them?
  6. Arrival, departure and no signal. How will each person sign in and out? What is the agreed alternative if the phone or connection does not work?

WorkSafe's contractor checklist covers work locations, risks, emergency procedures, time-in/time-out reporting and a backup plan for poor phone coverage. It also recommends noting what you told the contractor. The questions above turn those topics into an orchard briefing.

Make the route clear before the ute arrives

Give the entrance a name that matches the sign on the road. If there are several gates, include a marked map and a reporting point. Keep the directions specific enough that a first-time visitor can follow them.

For example, "Use the office entrance and report before entering the blocks" is more useful than "Come in the usual way".

Check that the route in the message, the map and the gate signs agree. If you close a track or change the entrance, update the directions before the next arrival. Keep the biosecurity steps at the gate in that review too.

Review summer work and access together

Ask the person organising the job what equipment and activities they are bringing onto the orchard. Review those alongside today's conditions, other work and your site controls.

Fire and Emergency's rural fire guide identifies machinery and equipment as possible ignition sources. It advises checking fire weather and fire-season status before work, and discussing local wildfire risk with Fire and Emergency. Use that guidance when planning tasks such as mowing, welding or work with cutting equipment. Record the arrangements you agree, including who will review them if conditions change.

Spray restrictions need their own clear handover. Confirm the affected area and current instructions with the person responsible for the spray work. Do not infer a re-entry time from the weather or from a generic sign-in message.

For kiwifruit, Zespri's agrichemical planning guidance describes job sheets, notification arrangements, product re-entry information and signage. Check the requirements for your crop, products and operation.

Reach the people who are already on site

Changing the briefing for the next arrival is only part of the job. Decide how you will contact people who have already entered if a route closes, another task starts nearby or the agreed work plan changes.

Use the communication method agreed for that job. Ask the contractor to confirm the message reached their team, and record the change and confirmation. A new notice on a screen is not confirmation that everyone already working has seen it.

Keep emergency arrangements in the same conversation. Civil Defence's workplace preparation guidance covers emergency procedures, assembly points, contacts and alternatives when premises or files are unavailable. Review whether your current access arrangements still support your emergency plan. If you need somewhere to write the plan down, our free orchard evacuation plan template is a printable place to start.

A briefing template to adapt

Copy these prompts into your own message or job sheet. Fill in the details with the contractor before work starts; remove anything irrelevant and add the controls your job needs.

  • Site, job and date: [orchard, work area and planned work]
  • Use this entrance: [gate name and directions]
  • Report to: [person and reporting point]
  • Follow this route: [map or directions, parking and areas to avoid]
  • Current restrictions: [affected areas, instructions and who can confirm any change]
  • Changes since the last visit: [what is different and what to do]
  • Orchard contact: [name and agreed way to make contact]
  • If plans or conditions change: [who to contact before continuing]
  • Emergency arrangements: [how to raise the alarm and the relevant assembly instructions]
  • Sign in and out: [the routine for each person]
  • If the phone or connection fails: [the agreed reporting and communication alternative]
  • Briefing confirmed: [who discussed it, when, and any questions or changes agreed]

Keep a dated copy of the briefing you used. For the underlying arrival record, see what to record when visitors and contractors sign in.

Where GateBud fits

GateBud™ lets visitors and contractors scan a site QR code and check in through their phone's browser. You can provide site instructions and documents, record answers to your questions, and see recorded arrivals and departures on the Dashboard.

Use that alongside the briefing and the physical controls at the gate. Updating site information does not send an alert to everyone already on the orchard. A check-in or document acknowledgement does not establish that the work is safe to start.

If the page cannot load or a check-in is still waiting to send, use your agreed fallback. An unsent check-in is not on the central Dashboard. Make sure the person receives the relevant site information as well as having their arrival recorded.